One Montgomery Plaza-Norristown, PA
National Glass & Wyatt, Inc.
2 months
2 MSHF twins and 1 MSM-Super twin
Masonry Restoration of Stone & Brick
Description:
This is a five (5) phased project that moves around the building.This is phase 1. 1 MSHF twin and 5 MSHF singles
18th & Walnut Street-Philadelphia, PA
Palmer Waterproofing, Inc.
1 MSHF twins, 1 MSHF single units
Masonry Restoration of Stone & Brick
Temple University-Philadelphia, PA
Palmer Waterproofing, Inc.
2 months
2 MSHF twins and 1 MSM-Super twin
Masonry Restoration of Stone & Brick
Description:
The three (3) twin units were set in order to restore the masonry joints on the façade of the building. Working closely with Temple University was required on this project as it is located at the very busy intersection of Broad Street and Polett Walk. Side walk bridging including shoring towers were required to keep a handicap ramp open during construction.
44th & 6th Avenue, New York, NY
Enterprise Architectural Sales, Inc.
9 months
Twin Hek MSM-Super 77' long and Twin Alimak APF 123' long
Curtain Wall System installation
Description:
Equipment is being used to install curtain wall system to re clad the entire building. This project has multiple contractors working on the mast climbers, the demolition of the existing façade to allow the installation of the new curtain wall system is being performed by Bierzo Construction Corporation. The location of this project (1 block from Time Square) made it a challenge with the amount of pedestrian and vehicle traffic on the street.
Atlantic City, NJ
APG International, Inc.
6 months
Twin MS-ProMax (two twins on one set of towers)
Installation of curtain wall/panel system
Description:
After a fire destroyed the south side of the building, Northeast Mast Climbers provided a solution of a dual twin on one set of mast to expedite the completion. This twin system allowed two contractors to work on demolition of the damaged panels/curtain wall. Once the installation of the new system began, this dual system proved invaluable, it allowed one company to replace all the bolts that held the structural steel to the shear wall (damaged in the fire), while allowing APG International to install the new curtain wall/panel system.
Articles:
Our Borgata Hotel & Casino project was featured in “Scaffold Industry”. Click here to read the article.
Posted with permission by “Scaffold Industry” magazine, a publication of The McGraw-Hill Companies. May 2008.
Market Street, Newark, NJ
Watertrol, Inc.
8 months
Five twin units at 77’ long by 125’ high
Curtain Wall System installation
Description:
Equipment is being used to install curtain wall system to re clad the entire building. This project has multiple contractors working on the mast climbers, the demolition of the existing façade to allow the installation of the new curtain wall system. This project involved shoring of two levels into the basement as to support the weight of the equipment.
Wildwood, NJ
Jersey Panel
5 months
Two MS-ProMax at 47’ long, four MSHF’s at 39’ long all are 150’ high
Carpentry work and EFIS system
Description:
These units were used by the carpenters and roofers to complete the soffit work that was required at the top of the building. They were also used to install the EIFS system in the areas where the prefinished panels were not installed.
Lewisburg, PA
Masonry Preservation Services
23 months
GTP-500
Material Transport Platform to access scaffolding
Description:
This project was 180’ high, the scaffolding started around 130’ and the GTP-500 was used to bring men and material to the work location. |
Philadelphia, PA
Wyatt, Inc.
4 months
4-Single Hek MSHF’s
Metal Studs and Dens Shield
Description:
An installation that is becoming more popular with carpentry outfits, using mast climbers to install metal studs and dens shield. There was engineering required for shoring on the upper roof area, this was accomplished through the use of long beams to span across from beam to beam on the roof. This project has multiple trades using the equipment, upon completion of the back up system, the mason will be setting brick on the façade.
Temple University-Philadelphia, PA
Palmer Waterproofing, Inc.
9 months
2 MSHF twins, 1 MSM-Super twin & 4 MSHF single units
Masonry Restoration of Stone & Brick
Description:
The three twin units and 4 singles were set in order to restore the masonry joints on the façade of the building. This is a complete restoration of the entire façade of two building. Mast climbers were used on the Broad Street and Montgomery Avenues façade. Mast Climbers were used instead of swings or scaffolding because of the efficiency of the mast climbers, being able to access the entire façade with the touch of a button.